Northern link speed dating

With the exception of Morden and Clapham South, where more land was available, the new stations were built on confined corner sites at main road junctions in areas that had been already developed.

Holden made good use of this limited space and designed impressive buildings.

Abandoned plans from the 1920s to extend the line further southwards, and then northwards in the 1930s, would have incorporated parts of the routes of two further companies.

The C&SLR, London's first deep-level tube railway, was built under the supervision of James Henry Greathead, who had been responsible, with Peter W. It was the first of the Underground's lines to be constructed by boring deep below the surface and the first to be operated by electric traction.Golders Green, Morden; sidings at Edgware, Colindale, Hampstead, Chalk Farm, High Barnet, East Finchley, Archway, Camden Town, Euston (Bank branch), Moorgate, Charing Cross, Kennington, Tooting Broadway The Northern line is a London Underground line that runs from south-west to north-west London, with two branches through central London and three in north London.It runs northwards from its southern terminus at Morden in the borough of Merton to Kennington in Southwark, where it divides into two central branches, one via Charing Cross in the West End and the other via Bank in the City.By 1907 the C&SLR had been further extended at both ends to run from Clapham Common to Euston.The CCE&HR (commonly known as the "Hampstead Tube") was opened in 1907 and ran from Charing Cross (known for many years as Strand) via Euston and Camden Town (where there was a junction) to Golders Green and Highgate (now known as Archway).

Search for northern link speed dating:

northern link speed dating-31

Leave a Reply

Your email address will not be published. Required fields are marked *

One thought on “northern link speed dating”